CEOInterviews.AI
Start App
Michael Hudson
President, Chief Executive Officer and Managing Director, Southern Cross Gold Consolidated

Michael Hudson of Southern Cross Gold Consolidated Ltd. talks to Joe Mazumdar | MIF | Feb 2026

📅 Mar 06, 2026 Metals Investor Forum 11 MIN 431 VIEWS 54 SEGMENTS · 2 SPEAKERS
Michael Hudson, President and CEO of Southern Cross Gold Consolidated Ltd. (TSX: SXGC | ASX: SX2), talks to Joe Mazumdar of Exploration Insights at the Metals Investor Forum in Toronto on Feb. 27–28, 2026. Southern Cross Gold Consolidated is an exploration company advancing the Sunday Creek Gold-Antimony Project in Victoria, Australia. The project is emerging as a globally significant high-grade gold system and has delivered exceptional drill results that continue to demonstrate strong expansion potential along a large mineralized corridor. The companies presenting at the Metals Investor For...

Questions asked in this interview

8
  1. 0:06Southern Cross Gold is dual listed: SX2 on the ASX, SXGC on the TSX, which you just opened on Friday. Is that correct?
  2. 0:46So Southern Cross Gold always has a lot of rigs going, but now you have permitted a decline. So what's that all about?
  3. 3:57And the budget's like 30 million. Was it 30 million Aussie?
  4. 4:22And when would that update be?
  5. 4:31Northern hemisphere summer or southern hemisphere some months?
  6. 6:48So what should somebody be looking for over the next 12 months of a very well-funded program?
  7. 7:08Canadian, Australian? How do you do that?
  8. 9:32Like, what are you held by?
Joe Mazundar 0:06 ↗
Hi, it is Joe Mazundar of Exploration Insights. I'm at the PDAC 2026 edition of the Metals Investment Forum and with me right now is the CEO of Southern Cross Gold, Michael Hudson. Michael, how's it going? Southern Cross Gold is dual listed: SX2 on the ASX, SXGC on the TSX, which you just opened on Friday. Is that correct?
Michael Hudson 0:32 ↗
Correct. We had the honor of ringing the bell, so to speak. It's actually pressing a plastic button, I noticed. It's not linked to the market. Yeah, and they tape it. I think anyway.
Joe Mazundar 0:46 ↗
So Southern Cross Gold always has a lot of rigs going, but now you have permitted a decline. So what's that all about?
Michael Hudson 0:55 ↗
That's all about building this project quicker, essentially, and the progressive permitting that comes with de-risking the project. It literally — the Victorian government wanted to advance this project. They came to us about a year ago and essentially said, in a nice way, 'Would you stop making it bigger and give us something to permit?' And it got us thinking about how to advance the project and that the government was really there to help support develop this project.
Joe Mazundar 1:24 ↗
The government is here to help.
Michael Hudson 1:27 ↗
Exactly. And Victoria hasn't seen that for a long, long time. So it was a moment, and we said, well, the limitation on this project is the drill out. There's a limitation on any project, essentially: time and money. We've got the money, so it's time. So permit the decline, take a lot of the risk off the table because we're taking the water risk, the fauna and flora risk, the native veg risk, the air, the impact on people, and all those criteria. It's not building a mine; it's an exploration decline, but a lot of those things. So, for example, the water: we've learned what our water balance is and the quality of the water, and we can irrigate our large farm, which is 3,600 acres, and we've dealt with the water issue on the project by doing that.
Joe Mazundar 2:16 ↗
That's from pumping the decline.
Michael Hudson 2:17 ↗
That's from dewatering.
So that's one example. So progressive permitting and working with a government that is genuinely supportive of the project, and then we can add another 12 rigs. So we've got 10 today going, and then double shifting them. So each rig underground is three times as productive, essentially, as a surface rig. And then you're drilling it out quicker. And we would go from 10-ish, 10 to 22 rigs on the project and two rigs regionally. So 24 project rigs.
Joe Mazundar 2:46 ↗
And this would make it, as you said, one of the largest development projects, gold projects, or any project — pre-development projects globally.
Michael Hudson 2:58 ↗
Yeah. So, and then you're getting down, and there's other real aspects. You're getting down and seeing the mineralization and de-risking it from that point of view. You're taking bulk samples eventually and mapping it and saying, 'Well, this is what holes 20 or 30 meters apart look like. What does it look like when you go underground?' And of course we'll learn many things by doing that, and that's why you go underground on any high-grade deposit.
Joe Mazundar 3:23 ↗
Oh yeah. Yeah. And they get more density of drilling, get things into indicated quicker. But this will be not so long from now in terms of you've got the portal. You're already doing it.
Michael Hudson 3:32 ↗
We're working — I mean, there's a lot of — and then if you look at the presentation, you'll see there's a lot of machines on surface getting all the surface work: the dams, the stockpiles, the portal construction. So setting ourselves up to go down with the tunnel or the decline. And that should start going underground — that will all be done by April, and then we should be done in six to seven months. So that's October to November to go down a kilometer.
Joe Mazundar 3:57 ↗
And the budget's like 30 million. Was it 30 million Aussie? Okay. And in the meantime, you've got another budget for the drilling from surface that you'll be doing until —
Michael Hudson 4:04 ↗
60 million, and we're about 50 km into a 200 km drill program. Now we're converting from the exploration target, which was 2.2 to 3.2 million ounces at between 8.2 and 10.6 a year ago. You'll see an update to that. So that's obviously got bigger because we've drilled more.
Joe Mazundar 4:22 ↗
And when would that update be?
Michael Hudson 4:23 ↗
It's coming in some months.
Joe Mazundar 4:26 ↗
Some months?
Michael Hudson 4:27 ↗
Yeah. I'm not going to give you a date.
Joe Mazundar 4:28 ↗
Not summer months?
Michael Hudson 4:29 ↗
No, not summer months. Some months' time.
Joe Mazundar 4:31 ↗
Northern hemisphere summer or southern hemisphere some months?
Michael Hudson 4:36 ↗
Either.
Joe Mazundar 4:36 ↗
It's an accent thing. So you've got the drilling obviously ongoing, and what was interesting from the last release — and I do read the releases — you were drilling towards Christina and you started hitting high-grade that way up on that section where usually, I mean, it's Rising Sun, Golden Dyke. You're taking those to depth because that's where a lot of the high grade is, but now you're finding additional high grade. It is an incredible project.
Michael Hudson 5:09 ↗
And, you know, somewhat naively, but it's all in hindsight, we did exactly as you said. We drilled under the old mines and we followed them down because we wanted to get deep early, because we know that these systems transition to amazingly high-grade systems below, and more gold over antimony at depth. Yeah, and lots more free gold, as opposed to gold associated with antimony, which, you know, is a simpler process. But it's the grade that's the main thing that changes. And so that's how we focused doing that over five different bodies across the 1.4 kilometers. And now just by nature of infill drilling — and it's not really infilling and not changing the volume — we're adding a lot to the volume by finding these new areas. And so Golden Dyke has just automatically doubled in width by one drill hole, showing us there's 16 more veins to the western side, and we know that Golden Dyke now joins to Rising Sun on the other side. So these things —
Joe Mazundar 6:06 ↗
And one of them hasn't been drilled to the same depth.
Michael Hudson 6:08 ↗
Not at all. Golden Dyke's just starting to get into the Cinderella zone at that transition. We're just starting to see that in the holes that are around about five or six.

27 more exchanges in this transcript

Sign in free to read the rest of this interview. No card required.

Sign in to read the full transcript

Cite this transcript

APA, MLA, BibTeX
APA

Hudson, M. (2026, March 6). Michael Hudson of Southern Cross Gold Consolidated Ltd. talks to Joe Mazumdar | MIF | Feb 2026 [Interview transcript]. Metals Investor Forum. CEOInterviews.AI. https://ceointerviews.ai/interview/3041128/

MLA

Michael Hudson. "Michael Hudson of Southern Cross Gold Consolidated Ltd. talks to Joe Mazumdar | MIF | Feb 2026." Metals Investor Forum, 6 Mar. 2026. Transcript, CEOInterviews.AI, https://ceointerviews.ai/interview/3041128/.

BibTeX
@misc{hudson2026_3041128,
  author       = {Michael Hudson},
  title        = {Michael Hudson of Southern Cross Gold Consolidated Ltd. talks to Joe Mazumdar | MIF | Feb 2026},
  howpublished = {Interview transcript, Metals Investor Forum. CEOInterviews.AI},
  year         = {2026},
  month        = {mar},
  url          = {https://ceointerviews.ai/interview/3041128/},
  note         = {Speaker-attributed transcript with timestamps}
}