Hey everyone, this is Dave. Thank you for tuning in. As always, recently I had the opportunity to go down to Austin, Texas, and tour Firefly Aerospace's facilities where they do all their engine testing, manufacturing their rockets, and their spacecraft. I was able to talk to several key technical people including CEO Jason Kim, CFO Darren Ma, and Director of Investor Relations Michael Sheets, among others. Thank you to all those people just mentioned, as well as everyone else at Firefly Aerospace for making this possible. I had a great time seeing a lot of cool hardware up close. Really learned a lot and can't wait to bring some of that information to you. Today, I'm sharing my conversation with CEO Jason Kim, and to follow, I will share some footage and thoughts from my tour of the facilities. Please do subscribe if you haven't already and you find this interesting. Thank you to the channel members for making this possible. And let's go ahead and dive into my conversation with Jason Kim.
Okay. Well, thank you so much for having me here. I can't believe I'm in the command center here for the lunar lander. Considering where we are, I think we should probably start with Blue Ghost. So, incredible achievement by the team, obviously. What was it like that day as you were here in the control room when we were getting ready to land? How was the nerves? What was the team feeling like?
Well, first off, welcome, Dave. I've been a follower of yours even before I came to Firefly. So, nice work. Keep it up. As far as this room that we're in, I would say it's historic. Every time I come in here, I get goosebumps. And I recall when I was, you know, a few feet away from us in the back watching our workforce, it was a badgeless team and we had NASA there, we had Firefly and other partners, and it was tense.
Because all that training was leading to this one moment and all you could see was telemetry. There wasn't like real-time video streams. So you're looking for things like altitude and acceleration and thermal and power and propulsion pressures, and everything was nominal. And when I heard the chief engineer say the words, 'Here we're seeing 1 m/s in lunar gravity,' everything was stable. We saw the foot pad sensors telling us that everything was stable. He said we stuck the landing, and everybody just kind of got up and a bunch of high fives and hugs, and everybody was super, super happy. And just a couple miles away we had an outdoor venue where we had 2,000 of our employees and their families and investors watching similar feeds and the webcast, and I heard you could hear a pin drop there as well. But once those words were spoken, everybody celebrated as well.
Yeah. So how do you compare say getting ready for an Alpha launch versus getting ready to land on the moon? Which is more stressful, which is more difficult?
You know, we take everything seriously, whether it's a launch or a landing or any type of important mission maneuver. It's all important. And so we are focused, we've got a sense of urgency, we're prioritizing the mission, making sure everything is nominal that we're seeing. If it's not, we've got to address it. But we take it really, really seriously. And that landing was a testament of the whole team. They rehearsed so many hours. They did so many simulations. They've done so much testing on the actual designs and hardware components and software. Everything that went into it, they've done hours and hours of testing. And so that is kind of what results in these successful missions, whether it's a launch or a landing.
Okay. And then gearing up to the launch or landing, when I was watching you guys and thinking about the recent history, there's been so many failures even by nations as opposed to just companies with much larger budgets. How daunting was it getting ready for this task?
You know, it was a lot of intensity. We knew how important this landing was. Every landing is really important. But because of the results prior to us, we had the opportunity to change the trajectory of the performance of this program in particular. And so it was really a lot of pressure. But again, the team rehearsed, they did everything they could in their control, and they had a good design with margins and did all the testing. So they did everything they could, and then addressing anything that would come their way, they did a great job of that.
So that's how they're treating every one of these missions, whether it's Blue Ghost 1, 2, 3, or 4, even Moonfall and more.
Yeah. And when I was watching it, I really wanted the CLPS program to work and be successful. I was thinking, you know, there had been some failures. This concept of low-cost commercial missions to the moon. Do you think there was a lot on the line and there's potential if we didn't have a big win on the board for CLPS, things could have gone the other way and maybe gotten cancelled or reduced?
There's no saying what would have happened. What I would say is in the past NASA has done some amazing models like the commercial resupply mission and the commercial crew program. When NASA set that up, they allowed a number of great companies to bid on it, and in the end they actually got more successful providers by having multiple shots at the goal. And this commercial leveraging was also used on the Commercial Lunar Payload Services program for the moon. And so I think NASA was always upfront that it was a multiple shots at the goal kind of approach.
So my hunch is it would have kept going and you just continue proliferating these systems and increasing the frequency of them as well.
Mhm. Is there any cool stories or problems or challenges you can tell us about that the team had to overcome or deal with on the mission?
One that comes to mind is, and it kind of made me think we just don't know enough about the moon yet. We had a lot of Apollo-era data models from actual and model performance of the temperatures. And so we were using that when we designed our Blue Ghost mission, all the components, specifications. Luckily and deliberately we had margin. And so when we got there, a combination of dust on regolith on the radiators and a nearby crater reflecting extra sunlight back to us caused us to experience 230 degrees Fahrenheit plus on the sunny side. And so the whole range was over 500 degrees, and that was not expected based on those Apollo models. Now we're updating that. And as we do more and more missions, we'll update it even more because we want to make sure humans are in predictable environments. And there's no doubt we'll get there. But the team came up with something called Project Parasol in real time. When you have this overheating condition, you can do load shedding and turn off things, but we really didn't want to turn off all the payload. So they used the big antenna on top that had a big surface area. They used it as a shade, a sun shade, and blocked the heat on our radio, which allowed us to continue downlinking the information while we're taking information from our instruments and payloads.
Pretty creative on the fly.
Yeah. I'm kind of curious, bigger picture though, why focus on the moon? Has it always been kind of key to Firefly's strategy or is that something that's evolved more recently?
Yeah, I think it's always been a great strategy to diversify. We have a lot of experts from a lot of great companies that have rocket experience, spacecraft experience, ground experience. So we had the talent. I think the founder was very innovative in thinking, 'Hey, we saw this on the commercial crew and commercial resupply vehicle side. SpaceX went after that and then they turned into a more diversified company.' So our founder thought this was that moment for Firefly, and I think it was a good decision.
Yeah, seems to have turned out well. I know you do have a lot of commercial payloads as well on the Blue Ghost missions. Do you think we could ever see a time in the future where maybe you have a pure commercial mission that doesn't even involve NASA landing on the moon?
I do, because the moon economy is going to continue to grow. The moon is so important, as you know, for exploration, science, human presence. NASA's getting into it, other nations are getting into it, and there are commercial companies wanting to mine and return different resources, even do manufacturing on the moon. And then when there's moon bases, there's going to be even more of a lunar ecosystem. So because of that, it's not just NASA and ESA and nation states wanting to do that. There are business models commercially where they need dedicated landers. And so we talk to everybody out there, whether it's on the government side or international or commercial side, and there are a lot of great ideas out there. So I see it happening.
That would be a cool mission. Some of the missions you do get to do with NASA though, incredibly cool, exciting. I have to imagine that's part of the reason you want to do them. But then you see the volatility when there's changing administrations. You look at the Gateway station getting cancelled, thinking about the proposals around commercial LEO. How do you kind of deal with the risk-reward of working with NASA on these high-profile missions and investing in these platforms like Blue Ghost?
You know, when you go back to it, it's physics and engineering and science. These technologies are fungible, they're transferable. And so if you have one application for it, chances are there's other dual uses or other uses of them as well. So for instance, landers, landing on the moon, orbiters around the moon, those are all transferable technologies for things like Mars. And so you could repurpose technologies if you do it the right way, because at the end of the day, it's the same avionics, software, actuators, capabilities that you can apply to different missions. For instance, a lot of our moon work is also getting applied, the technology is getting applied to national security as well. So that gives you an example of how transferable these technologies are. So we're going where the demand is and where our customers need us.
Yeah, makes sense. You know, if it was even a little bit of a gamble just focusing on the moon, certainly seems to have paid off with the announcements around CLPS and CLPS 2.0 and NASA's ignition event. What do you think about the increased demand for the moon and how that will affect Firefly going forward?
It's wonderful. I mean, we had already been investing in the moon. We doubled the size of our spacecraft campus here in Cedar Park, Texas, getting ready for that ramp, and we even quadrupled our clean room space. And so we were already thinking that this was going to be a growing market. And the fact that everybody's shifted, whether it's the government, the space industry suppliers, as well as investors and analysts, even understand the importance of the moon, it's really great for us because we're positioned to take on more business as we increase our capacity for these landers and these orbiters. And so the fact that the CLPS budget, CLPS 1.0 went from 2.6 billion to 4.2 billion, and now there's CLPS 2.0, that's 6 billion potentially, and then the Moon Base program, which is 20 billion, I think things are just getting started.
Yeah, seems like it. You know, you were talking previously about annual landings and now Jared's calling for like a monthly cadence. Are you guys up for the challenge helping out with that?
Like I alluded to, we've already been investing in increasing our capacity, and now we have an amplified demand signal, right? And so that gives us more confidence investing even more in expanding our capabilities for landers and orbiters, and our supply chain is a smart decision. And so we're going to continue to invest, continue to hire, continue to execute on these missions for Jared and NASA.
Okay, sounds good. Let's continue on to the launch side of the business now. And I would like to start with Alpha. I don't think I'm speaking out of turn saying that the track record when you joined was maybe a little bit more checkered than you would have liked. What have you done to become confident in the vehicle's future reliability and what changes have you put in place for the future?
An extreme focus on safety, quality, and reliability enhancements. Also just prioritizing the repeatability and reliability of the Alpha vehicle. I think we definitely have seen with any space company there's always challenges and failures. It's how you recover from it. You know, when we had a challenge late last year, we immediately had a stand-down and it really just got everyone on the same page of looking at vulnerabilities and how do you improve your processes and your training. And that focus and approach resonated with everybody at the company, and you could see the fruits of the labor with a flawless Alpha Flight 7 launch. And it even validated some of the key technologies for our Block 2 upgrade of Alpha for Flight 8.
Mhm. Yeah, you did mention one of those failures, and I was kind of just thinking about it, like how does your team handle the tough days? I know there's been some amazing days, but there is adversity as well. So how do you guys handle that and move forward?
You know, I think it's just resiliency, perseverance of this company. Our people just get back up and they're very focused on the mission. And they are committed to our customers and our investors. And so they're really doing this as a bigger-than-Firefly mission. So that's one thing. But we have tough people and smart people, and we learn from all these challenges and get better from it. So the first thing I did was get with our folks and make sure that they get their heads up, because they're amazing people. I get the privilege of working with these smart people, passionate people. They have high accountability. They have focus on excellence in everything they do. And so it's really just supporting them as much as I can. And they're doing great stuff.
Yeah, for sure. And then the next launch I think is going to be the first Block 2 launch. Could you tell us a little bit about the changes of Block 2 with Alpha?
Yeah, it's going to stretch about 7 feet more. And we're going to consolidate the in-house components like avionics as well as batteries on there for more manufacturability and reliability. And then we're beefing up the temperature protection system that we validated on Flight 7. And then in addition to that, we're using strong carbon composite techniques such as more use of the automated fiber replacement machine for all the tanks and primary structures. So really it makes it a more reliable, manufacturable product long term.
Okay. And kind of curious if it's stretching a bit, will it be able to carry a little bit more payload perhaps?
No, we're still keeping it at a one-ton rocket.
It's really just focusing on the manufacturability and the reliability.
Okay, fair enough. Do you think there'll be future Block upgrades or is this kind of going to be the new steady-state final product for Alpha?
You know, we're always trying to improve our products, but right now our focus is on repeatability and reliability. And so that's our focus, is steady year-to-year ramp up of our deliveries of that rocket. And so that's where our focus is at.
Okay. And then on the launch site side, I think it's interesting. You guys seem to be pretty aggressive compared to perhaps some other companies. Can you tell us a little bit about this strategy? I think I've heard you mention launch as a franchise. Can you tell me how that kind of works?
Yeah, it's a multi-phase endeavor. And right now we're working with Sweden, for example, to launch an Alpha rocket from a pad that we're standing up in Sweden. And that starts with a great collaboration with SSC Space, they're our local partner there, and there's a technology safeguard agreement that's already been approved by both countries. And so it's going to be a great mission to start launching from that location to really open up more launch pad for resiliency for our nation, our allies, open up that market as well because there's a lot of demand for one-ton rockets in that area. So it's going to be a great opportunity, and then we're going to take that and apply it to other places. And so you heard that we are also in discussions with Japan and Space Katan, and looking at the feasibility of launching from Hokkaido, Japan as well.
Okay. And then I was thinking about it recently with this unfortunate New Glenn explosion. Do you think that validates the need for having a lot of different launch sites and more flexibility on that front?
Well, first of all, like I mentioned before, all space companies have challenges and failures, and there's no doubt that Blue Origin is going to come away from that experience stronger and do it swiftly. What I would say is the future is having multiple diverse companies out there providing access to space. There's growing needs and demands to put more into space, whether it's national security or international, commercial, tech, or direct-to-device kind of missions, in addition to orbital data centers and so on and so on. The space TAM is growing so much that there's going to be more and more demand for launch, and the supply is not always going to keep up. So we've got to continue to have great companies launching, and that's going to just make the industry more robust. And I've seen this in other places, whether it's national security or in commercial. You want to have that diversity because there's no one size that fits all, but two, when someone's oversubscribed, there might be others that can make up for that and vice versa. So I've seen this play out multiple times.
Yeah. Can you also tell us a little bit about the recent announcement for a deployable launch system? And I think there was also sea launch platforms. That sounded pretty interesting to me.
Yeah, it's something we unveiled earlier this year. It's just taking Alpha and being able to put the support equipment and the payload integration equipment and the Alpha vehicle in containers and deploy it to different sites. It really gives you flexibility on where you can launch. Again, goes back to having more resilient launch locations, more strategic places to launch to. And so that's the point of it. It really helps out with things like tactically responsive space. It could help out with other great missions like Golden Dome and such as well in the future. And then the sea launch opportunity that you're referring to, that was a collaboration of sea launch, Lockheed Martin, and Firefly working together on the feasibility of launching off of offshore, using existing systems like Alpha rocket and the sea launch platform and Lockheed's capabilities.